1999版FIDIC合同条件法律解读(红皮书)
图片标签: 发布:2022-09-17 .... 来源:www.tuj8.co
1.1.3
.3 “Time for completion
” means the time for completing the works or a section under sub-clause8.2, as stated in the Particular Conditions, calculated form the commencement Date.
1.1.3
.7 “Defects Notification Period
” means the period for notifying defects in the works or a section under sub-clause 11.1,as stated in the particular Condition, calculated form the date on which the works or section is completes as certified
1.1.5
.6 “Section
” means a part of the works specified in the particular conditions as a section.
所以,要准确理解这些定义的含义,还需要结合合同文件里的其他信息。“定义”的理解并不难,这里无需对其作出更多的解读和分析。
.3 “Time for completion
” means the time for completing the works or a section under sub-clause8.2, as stated in the Particular Conditions, calculated form the commencement Date.
1.1.3
.7 “Defects Notification Period
” means the period for notifying defects in the works or a section under sub-clause 11.1,as stated in the particular Condition, calculated form the date on which the works or section is completes as certified
1.1.5
.6 “Section
” means a part of the works specified in the particular conditions as a section.
所以,要准确理解这些定义的含义,还需要结合合同文件里的其他信息。“定义”的理解并不难,这里无需对其作出更多的解读和分析。